Select a language:
News

Ted Craig Regional Park Culvert and Sidewalk Replacement

Aerial image of a path over a creek and a white box showing project area

What:

This project is located at the northwest end of the lake at Ted Craig Regional Park. The current corrugated metal pipe (CMP) culverts have deteriorated beyond repair and the sidewalk is now undermined and, in some areas, has detached from the structure. This project is to demo the sidewalk over the culverts, demo what is left of the CMP, remove riprap and replace with precast or cast-in-place concrete box with two new 18-inch diameter corrugated metal pipes over a marine mattress, riprap reinforcement, and replacement of concrete sidewalk.

When:

Anticipated Construction Duration:
July 2022 through September 2022
Working Days/Hours:
Monday – Friday, 8 a.m. to 5 p.m.

Contact Information:

OCPW Supervising Construction Inspector Mario Garcia: (714) 599-0681
OCPW Senior Construction InspectorPaul Weaver: (714) 719-1742